Introduction Inputs/Outputs per Phase Inputs/Outputs per Step of Phase C Input List Output List Input Descriptions Output Descriptions
This section provides structured lists of all the input and output items referenced in the Architecture Development Method, together with descriptions of those inputs and outputs.
The section is structured as follows.
Immediately below are two tables summarizing the major inputs and outputs in the ADM, the first summarizing the whole of the ADM per phase, and the second summarizing Phase C, Target Architecture Development, per step.
Following the tables are descriptions that indicate the type of content recommended for each input and output item.
Note that not all the content described here need be contained in a particular input or output. Rather, it is recommended that external references be used where possible: for example, the strategic plans should not be copied into the Request for Architecture Work, but rather the title of the strategic plans should be referenced.
Also, it is not suggested that these descriptions should be followed to the letter. However, each element should be considered carefully: ignoring any input or output item may cause problems downstream.
Finally, note that versioning is used to indicate that input or output items may undergo change as the ADM is executed. As an input or output item is updated, a new version may be produced. The initial version is named Version 1, and subsequent versions are named Version 2, Version 3, etc.
A graphical representation of the information given here is presented in Part IV, ADM Model, which gives a detailed model of the ADM, showing the ADM phase structure and their relationships to information obects and other entities in the architecture environment.
Inputs |
Request for Architecture Work |
Request for Architecture Work Statement of Architecture Work Re-usable solutions building blocks Business Architecture - Version 1 (specifically, the business process driven list of candidate building blocks) |
Request for Architecture Work Statement of Architecture Work Re-usable architecture building blocks Business Architecture - Version 2 Re-usable solutions building blocks |
Request for Architecture Work Statement of Architecture Work Re-usable architecture building blocks Business Architecture - Version 2 Technical Architecture - Version 1 Product Information |
Request for Architecture Work Statement of Architecture Work Re-usable architecture building blocks Business Architecture - Version 2 Technical Architecture - Version 1 Impact Analysis (Project List) |
Request for Architecture Work Statement of Architecture Work Re-usable solutions building blocks (from organization's solutions continuum) Impact Analysis (Time oriented Migration Plan) |
New technology reports Request for Architecture Work changes - new business changes |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Phase |
A. |
B. |
C. |
D. |
E. |
F. |
G. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
Technical Architecture - Version n.m
|
Inputs |
Re-usable architecture building blocks Re-usable solutions building blocks Business Architecture - Version 2 Request for Architecture Work Statement of Architecture Work |
Business Architecture - Version 2 Request for Architecture Work Statement of Architecture Work(?) Technical Architecture - Version 0.1 |
Re-usable architecture building blocks Re-usable solutions building blocks Business Architecture - Version 2 Technical Architecture - Version 0.2 |
Business Architecture - Version 2 Technical Architecture - Version 0.3 TOGAF TRM TOGAF SIB |
Business Architecture - Version 2 Technical Architecture - Version 0.4 |
Business Architecture - Version 2 Technical Architecture - Version 0.5 TOGAF SIB |
Re-usable architecture building blocks Business Architecture - Version 2 Technical Architecture - Version 0.6 TOGAF SIB |
Business Architecture - Version 2 Technical Architecture - Version 0.7 |
||||||||||||||||
Phase C steps |
1. |
2. |
3. |
4. |
5. |
6. |
7. |
8. |
||||||||||||||||
|
|
|
|
|
|
|
|
|
||||||||||||||||
Technical Architecture = Technical architecture models + Technical architecture specification + Requirements traceability + Gap report ... |
Request for Architecture Work | obtained from the sponsoring/funding organization |
Re-usable Architecture Building Blocks | supplied by the architecture organization of the business |
Product Information | supplied by the Information Technology organization of the business, or supplying partners |
New technology reports | supplied by the technology watchdog organization (sometimes the Information Technology organization, sometimes a corporate technology group) |
Statement of Architecture Work | produced by the architecture organization of the business |
Business Architecture (draft to controlled versions) | produced by the architecture organization of the business |
Technical Architecture - Impact Analysis | produced by the architecture organization of the business |
Architecture Contract | produced by the architecture organization of the business |
Organization sponsors
Organization's mission statement
Business goals (and changes)
Strategic plans of the business
Time limits
Changes in the business environment
Organizational constraints
Budget information, financial constraints
External constraints, business constraints
Current business system description
Current architecture/IT system description
Description of developing organization
Description of resources developing organization has available
Technical architecture documentation and models from the business' Architecture Continuum.
Functional descriptions of products that are candidates for the implementation
Architectural descriptions of elements that are candidates for the implementation
New developments in potentially relevant technology
Statement of work title
Project request and background
Project description and scope
Architecture vision
Managerial approach
Change of scope procedures
Responsibilities and deliverables
Acceptance criteria and procedures
Project plan and schedule
Support of the enterprise continuum
Signature approvals
Baseline of current business architecture
Baseline technical description of current IT system in native terms
Baseline of current architecture in TOGAF terms
Baseline technical description of current IT system in TOGAF terms
Business requirements and key system and architecture drivers
Business return given required changes
Candidate architecture building blocks list
Candidate architecture building blocks models
Candidate solution building blocks list
Candidate solution building blocks models
Relevant business process descriptions
Assumptions (e.g. business, financial, organizational, or required technical functionality)
Constraints
Technical constraints
View imposed constraints
Target architecture principles
Principles embodied in the current system
New governing principles
Technical architecture model
Architecture building block models of views (minimally model of functions and a model of services)
Architecture building block models of service portfolios (organizational specific framework)
Technical architecture specification
Per architecture building block:
Details of the technical functionality
Fully defined list of all the standards
Description of building block at the levels necessary to support implementation, enterprise wide strategic decision making, and further iterations of the architectural definition process
Rationale for decision taken that relate to the building block, including rationales for decisions not to do something
Specification identifying the inter-working with other building blocks and how they do so
Guidelines for procuring
Standards summary list
Requirements traceability
Acceptance criteria
Criteria for choosing specifications
Criteria for selection of portfolios of specifications
Criteria to test merits of architecture (key question list)
Report on cost/benefit analyses
Report on how the proposed architecture meets the business goals and objectives
Criteria response answers to key question list to test merits of architecture
Gap report
Report on gap analysis
Report of gap analysis matrix
Mapping of the architectures in the architecture continuum
Change requests for extensions or amendments to related architectures
Project list
Name, description and objectives of each impacted project
Prioritized list of impacted projects to implement the proposed architecture
Time oriented migration plan
Benefits of migration, determined [including mapping to business requirements]
Estimated costs of migration options
Implementation recommendations
Criteria measures of effectiveness of projects
Risks and issues
Solutions building blocks - description and model
Signed statement of intent on following the architecture from developing organization
Introduction
Background
The nature of the agreement
Scope
Strategic requirements
Conformance requirements
Architecture adopters
Time window